I am trying to figure what is the right procedure for doing the delta and its process chain. My supervisor wants me to do everything in Dev System, and then do the transport to QA and Production. So I will have to create two process chains for the delta (one for Initialization and other for Delta load). I know I have to create two transports but 2nd transport cannot be release until 1st process chain (1st transport) completed in QA/Prod.
My question is will the transport for Delta Initialization and Delta Load will work? Or it is better to do the delta individually on each system?
Also, I know I already did the delta in Production system but if I do the transport, will I have to reset the delta and start over to be on the safe side?