Hello PP Guru’s,
I have below situation in production environment,
MRP job for plant – A (Takes more time – 14.650)
MRP job for plant – B (Takes less time – 4.512)
When I compare the variant / attributes with plant A and B, I observe only difference in attribute is scheduling (2 - Lead Time Scheduling and Capacity Planning) for plant A.
For plant B scheduling (1-Determination of Basic Dates for Planned) it was updated.
So in my observation this scheduling is playing a major role for MRB job which takes more time in plant – A.
I am in process of changing the variant attribute for plant – A from scheduling 2 to scheduling 1.
I wanted to know from experts whether if I change any impact / problem will happen in future for plant A or not.
Please let me know what all the hidden impacts are there if I change the scheduling in variant attribute.
I look forward to your valuable input to reduce time for my MRP related job.
Regards,
Kumar S