MRP job takes more time (Duration / Sec)

$
0
0

Hello PP Guru’s,

I have below situation in production environment,

MRP job for plant – A (Takes more time – 14.650)

MRP job for plant – B (Takes less time – 4.512)

 

When I compare the variant / attributes with plant A and B, I observe only difference in attribute is scheduling (2 - Lead Time Scheduling and Capacity Planning) for plant A.

 

For plant B scheduling (1-Determination of Basic Dates for Planned) it was updated.

 

So in my observation this scheduling is playing a major role for MRB job which takes more time in plant – A.

I am in process of changing the variant attribute for plant – A from scheduling 2 to scheduling 1.

I wanted to know from experts whether if I change any impact / problem will happen in future for plant A or not.

 

Please let me know what all the hidden impacts are there if I change the scheduling in variant attribute.

 

I look forward to your valuable input to reduce time for my MRP related job.

 

Regards,

Kumar S