Preventive Maintenance Order is not releasing as per scheduled Planning in Counter Based Plan

$
0
0


Hi Experts

 

In The below schenario

 

There is a  counter based maintenance plan. of strategy 100 km,200 km,...1800 km..

Operaton1,  Operation2,... Operation3... defined in maintenance package for 100 km, 200 km,.... respectively.

Now issue is that system is releasing order as per sequence of scheduled planing & not according to schedule of current counter reading of counter.

case:  At 200km order 1 is released with operation1 only, logicaly system should release order with operation1, & operation2

          same like that at 300 km, system has released order with op1 & op2, logicaly system should release order with operation1, & operation3 as per strategy defined in maintenance plan.

 

In the present condition, what we have to do to get the desired result like for next counter reading of 400 KM system should release order with op1, & op4.

 

Best Regards

Pravin Gautam