Hi Experts
In The below schenario
There is a counter based maintenance plan. of strategy 100 km,200 km,...1800 km..
Operaton1, Operation2,... Operation3... defined in maintenance package for 100 km, 200 km,.... respectively.
Now issue is that system is releasing order as per sequence of scheduled planing & not according to schedule of current counter reading of counter.
case: At 200km order 1 is released with operation1 only, logicaly system should release order with operation1, & operation2
same like that at 300 km, system has released order with op1 & op2, logicaly system should release order with operation1, & operation3 as per strategy defined in maintenance plan.
In the present condition, what we have to do to get the desired result like for next counter reading of 400 KM system should release order with op1, & op4.
Best Regards
Pravin Gautam