Hi Experts,
Automatic Batch determination is configured based on FEFO (SLED)
Batch- A - GR date:Same for both
Batch- B - GR date:Same for both
Total shelf life: 1095 days
Delivery is picking Batch A always
Then manually changed the expiry date in MSC2N for batch B- reduced 1 year, so that Batch B will be picked in the delivery.
But still Batch A is being determined.
Please let me know which of the material ideally should pick and what the reason? why batch B is not getting determined?
How to control this based on the expiry date?
Thankyou,
Ravi